This engine has sure seen better days. Most of the small parts for this engine was scrapped years back. The steam chest was also split and re-sleeved from a 14" to a 13" cylinder. The repairs were well done and very over done in my opinion. I have made and located most of the parts that we need to make this engine run again. We were very lucky to have located a governor for this engine also. We have completed the valve re-build and made a new connecting rod for this engine. The foundation for this engine and the 2nd Bates engine will be poured winter 2023 / 2024.